“The Siemens S7-1500 PLC control system was designed, manufactured and installed by IES on-time and in-budget. Some equipment issues outside of IES control were quickly resolved in a collaborative manner and even our drawings were updated sympathetically for our Engineers convenience! Our production is now faster, safer and more efficient. I recommend IES to solve your industrial process control system problems.

Carlos Cardoso – Electrical & Automation Engineer, Huntsman Advance Materials

 

“IES successfully provided design, installation and testing services for the complete electrical scope for the Crossrail C806 Wallasea Island Wild Coast Conveyor Installation project. These conveyors handle excavated material from the Crossrail running tunnels and station sites in London at a rate of 10,000 tonnes per day at peak. The services provided included HV and LV distribution, Earthing, Lighting, Control Systems and building services.

By working closely with Crossrail, completing design review meetings and on-site inspections of works undertaken, IES achieved milestones on-time and within budget. IES providing consultation services throughout and with their help the most efficient, cost effective and innovative design solutions were implemented”

Kim Milnes – Marine Interface Manager, Crossrail

 

“The on-site delivery team were professional, overcame challenges and more importantly delivered the project within the tight time constraints. The commissioning works were completed on-time and the project delivered savings from day one, initial indication is the project is over delivering by 20% plus of our original forecast.”

Martin Howard – Senior National Technical Manager, ENGIE Business Energy & Services

 

“The workmanship and attitude to produce a first class job was excellent, it was a pleasure to work alongside the site team who battled through some terrible weather conditions and maintained a very high standard of work”

Michael Candler, General Foreman, BAM Nuttall