IES invest extensively in technology and personnel in order to constantly improve our capabilities. We utilise the latest computer and design tools and are committed to training our already highly skilled engineers. It enables us to provide the high standards our clients expect.

“IES have completed various Turnkey Contracts on site over the last 20
years and are presently contracted to provide technical support for PLC and Electrical systems on site.

The Turnkey Contracts have included installing PLC controls to replace obsolete control equipment, electrical side of the jetty enlargement scheme, refurbishment of withdrawable 415v Contacter Equipment, renewal of Conveyor Safety System, Supply and installation of new  Switchboards and MCCs.

IES have met contract compliance and programmes to our satisfaction. They work well with the station engineers to provide cost effective solutions.”

Nigel Staves, RWE npower. 

“IES successfully provided design, installation and testing services for the complete electrical scope for the Wallasea Island Wild Coast Conveyor Installation project. These conveyors handle excavated material from the Crossrail running tunnels and station sites in London at a rate of 10,000 tonnes per day at peak. The services provided included HV and LV distribution, Earthing, Lighting, Control Systems and building services.

By working closely with Crossrail, completing design review meetings and on-site inspections of works undertaken, IES achieved milestones on-time and within budget. IES providing consultation services throughout and with their help the most efficient, cost effective and innovative design solutions were implemented”

Kim Milnes, Marine Interface Manager, Crossrail

“The on-site delivery team were professional, overcame challenges and more importantly delivered the project within the tight time constraints. The commissioning works were completed on-time and the project delivered savings from day one, initial indication is the project is over delivering by 20% plus of our original forecast.”

Martin Howard, Senior National Technical Manager, Cofely GDF Suez

“The workmanship and attitude to produce a first class job was excellent, it was a pleasure to work alongside the site team who battled through some terrible weather conditions and maintained a very high standard of work”

Michael Candler, General Foreman, BAM Nuttall, Wallasea Island